CHIANG YING : STEEL PIPES

Chiang Ying : Manufacturing Process

Process (a) ~ (d) :
Bending Roll, Internal and External Point Welding, Pipe Joining & Assembly, Internal and External Circumference Welding.

Process (e) :
Performing Hydrostatic Test to check leakage detection. Fully fill pipe with water and pressurize the water untill designated pressure (bar) to detect leakage.

Process (f) ~ (g) :
Surface Preparation and External Bitumen Wrapping.

Process (h) ~ (i) :
Internal Cement Lining and Curing.

Process (j) :
Holiday Test and Patching Up for Storage, ready for shipment.


   
Copyright © 2004 Chiang Ying Engineering Sdn. Bhd. All rights reserved. CRM solution by Webse Technology.